Reinforcement with
metallic elements.
-
Upgrading of
Nonductile Reinforced Concrete frame Connections.
A. Biddah, A. Ghobarah, T.S. Aziz. ASCE J. Str. Eng., Aug 1997
-
Behavior of
as-built and retrofitted beam-column joints of a 1950s designed reinforced
concrete building frame.
Hakkuto, Park. Tanaka. Proc. Of Technical Con. of the New Zealand Nat. Soc.
For Earth. Eng. Wairakei: pp 16-27
-
Experimental
results of repaired and retrofitted beam-column joint tests in lightly r/c
frame buildings.
Beres, El-Borgi,
White, Gergerly. Cornell Univ. Tech. Rep No NCEER-92-0025, Nat. Center for
Earth. Eng, Research, State Univ. of New York, Buffalo, Oct 1992
-
Rehabilitation of R/C frame connections using corrugated steel jacketing.
Ghobarah, Aziz, Biddah. ACI Str. J. Vol 94(3) 1997
Reinforcement with
reinforced concrete jackets
-
Αποδοτικότητα
τοπικού δίπλευρου-τρίπλευρου
τοπικού μανδύα για την ενίσχυση εξωτερικών κόμβων πλαισίων Ο/Σ. Τσώνος,
Γεωργιάδου. 13ο Ελλ. Συνέδριο σκυροδέματος.
Ρέθυμνο 1999.
-
Strength of
Reinforced Concrete Frame Connections Rehabilitated by Jacketing.
Alcocer, Jirsa. ACI Str. J., May-Jun 1993
-
Repair and
strengthening of beam-to-column connections subjected to earthquake loading.
Corazao, Durrani. Rice Univ. Tech. Rep No NCEER-89-0013, Nat. Center
for Earth. Eng, Research, State Univ. of New York, Buffalo, Feb 1989
-
Experimental
results of repaired and retrofitted beam-column joint tests in lightly r/c
frame buildings.
Beres, El-Borgi,
White, Gergerly. Cornell Univ. Tech. Rep No NCEER-92-0025, Nat. Center for
Earth. Eng, Research, State Univ. of New York, Buffalo, Oct 1992
-
Lateral load
response of strengthened r/c beam-to-column joints.
Tsonos. ACI Str. J., 96(1) pp 46-56, Jan-Feb 1999
-
RC frame
connections rehabilitated by jacketing.
Alcocer. ASCE J. Str. Eng., Vol 119(5) pp1473-1431 May 1993
-
Rehabilitation of the of r/c frame connections using jacketing.
Alcocer. 10th WCEE, vol 9, Madrid 1992, pp5235-5240
-
Assessment of
the response of r/c frame connections redesigned by jacketing.
Alcocer, Jirsa. 4th US Nat. Con. On Earth. Eng. USA, May 1990, pp
295-304
-
Column-Beam
Joints failed under seismic loading,
repaired and re-tested under seismic loading. Tassios, Plainis,
Vassiliou. 6th WCEE, Vol 3, India 1977, pp 2532-2537
-
R/C Frame
connections rehabilitated by jacketing.
Alcocer, Jirsa. PMFSEL Report No 91-1, Phil. M. Ferguson Structural Eng.
Laboratory, Univ. of Texas, Jul 1991, pp 221
ΕReinforcement
with other techniques
-
Evaluation
and Retrofit of Beam-Column T-Joints in Older Reinforced Concrete Bridge
Structures.
Lowes, Moele. ACI Str. J., Jul-Aug 1999 .
-
Response of
repaired R/C exterior joints under cyclic loading.
Karayannis, Sideris, Economou. Proc. Og the 5th SECED Con. on
"European Seismic Design Practice-Research and Application" Balkema 1995, pp
285-292
-
Response of
original and repaired r/c joints under cyclic imposed deformations.
Chronopoulos, Tassios, Scapas. 10th ECEE Vol3, Vienna 1994, pp
2261-2267
-
Seismic
rehabilitation of R/C joints by epoxy pressure injection technique.
Filiatraut, Leburn. ACI SP160, 1996
|